Ready Mix Concrete

Ready Mix Concrete. DELIVERED ACROSS UAE.

A production network engineered around a single principle — that consistency is not a target but a discipline. Twin-shaft mixers, automated batching, and integrated thermal control across every facility.

Compliance

Certified. Audited. Approved.

Operating under an integrated management system certified to ISO 9001, ISO 14001 and ISO 45001, with product conformity approved by Dubai Central Laboratory and calibration traceable through EIAC.

Product Conformity

DCL Certificate of Product Conformity

Issued by Dubai Central Laboratory (Dubai Municipality), certifying conformity to specification TG 02 for the operation of ready-mix concrete plants — covering Plant #1 & #2 (CBU) at Deira Island.

Certificate No.CL24020923
Issued ByDubai Central Laboratory
StandardTG 02
ScopePlant #1 & #2 — CBU · Deira Island
Valid Until11 Nov 2026

Certifications & Approvals

Internationally accredited & locally approved
ISO 9001
Quality Management
Bureau Veritas
DU006084-002
ISO 14001
Environmental
Bureau Veritas
DU006085-002
ISO 45001
Health & Safety
Bureau Veritas
DU006086-002
DCL
Product Conformity
Dubai Municipality
CL24020923 · TG 02
GCLC
Calibration
EIAC-accredited
Traceable to SI
Plant calibration
0
Batching Plants
Across the United Arab Emirates
0+m³/hr
Installed Capacity
Concurrent maximum output
0
Emirate Branches
Dubai · Sharjah · RAK
24/ 7
Continuous Operation
Dispatch and quality control
Quality & Laboratory

State-of-the-Art Concrete Research

ISO-compliant laboratories at each major plant. All products comply with BS EN 206, ASTM C94, Dubai Municipality and Sharjah requirements. Regular third-party audits conducted.

Mix Design & Development

Bespoke designs for C10–C100, SCC, high-performance, underwater and marine sulphate-resistant mixes.

Incoming Material Testing

Cement, aggregates, admixtures and water — rigorous QC before production.
 

Fresh Concrete Testing

Slump, flow, air content and temperature on every batch before dispatch.

Hardened Concrete Testing

Cube crushing at 7, 14 and 28 days. Core extraction on-site when required.

Chemical & Durability

Chloride, sulphate and carbonation analysis for the UAE marine environment.

Certifications & Standards

BS EN 206, ASTM C94, Dubai Municipality, Sharjah — audited regularly.

01 / Geography

The geography of the network.

Six operating branches positioned to serve the principal demand corridors of the Emirates — from Jebel Ali Free Zone in the west to the eastern coastline of Khorfakkan.

B / 01
Jebel Ali
Dubai
03plants
B / 02
Deira Island
Dubai
02plants
B / 03
Sajja
Sharjah
02plants
B / 04
Hamriyah Free Zone
Sharjah
02plants
B / 05
Khorfakkan
Sharjah · East Coast
02plants
B / 06
Showkah
Ras Al Khaimah
02plants
— 02 / The Plants

An index of every facility.

Each facility documented in the order of its branch and asset code. Select a branch to view its plants.

Output ↘ Capacity (m³ / hr)
Branch view
B / 01 — DUBAI

Jebel Ali

Plants 03
Capacity 400 m³
03 / Capabilities

Capabilities across the network.

Six disciplines maintained as a uniform standard, regardless of plant location, age, or scale. The network is engineered to deliver the same concrete in Khorfakkan as in Jebel Ali.

Batching Precision

Fully automated weighing systems with real-time moisture compensation across aggregates. Dispatch tickets generated against tolerance, never approximation.

Tolerance± 0.5 %
Aggregate bins4 – 6 / plant
Cement silosup to 6

Twin-Shaft Mixing

Twin-shaft mixers are deployed across the entire network — the industry standard for intensive shear action and homogeneous discharge in high-grade structural concrete.

Mixer typeTwin-shaft
Batch volumes1,500 – 3,000 L
Cycle time≈ 60 sec

Thermal Conditioning

Ice plants and chilled-water systems at primary facilities allow specified concrete temperatures to be held at or below 32 °C through Gulf summer pours.

Target temp.≤ 32 °C
Ice capacity60 t / day
Chilled waterNetwork-wide

Digital Operations

SCADA-based plant control integrated with ERP dispatch, GPS fleet tracking, Salik gate logging, and Mulkiya asset records. Every cubic metre is auditable.

ControlSCADA + PLC
DispatchERP-integrated
Fleet209 GPS units

Quality Assurance

An ISO 9001-aligned laboratory at every branch. Daily cube testing, mix design development, and SCM trial blends — all governed by a single technical standard.

Branch labs5 of 5
Cube testing7 / 28 / 56-day
Mix designs120 + active

Sustainability by Design

Water reclamation, returned-concrete recovery, and SCM-based low-carbon mixes (GGBS / fly ash) deployed as standard substitutions where structural performance permits.

Water reclaimClosed loop
SCM mixesGGBS · Fly ash
Returned conc.Reclaimed
Combined Output

Network Capacity

Engineered for scale.

The thirteen plants together deliver more than 1,500 cubic metres per hour at peak — supplying the construction backbone of the Emirates without compromise on tolerance or temperature.

1,500
Hourly Capacity
28K
Daily Output
160+
Mixer Trucks
28+
Years Operating
"The strength of a network is the weakest plant in it.
So we have no weak plants."
— Operations Doctrine, SafeMix · 2026
Production Capacity

Block Factory.

1.2 Million Blocks / Month

Two fully automated block factories — Jebel Ali (Dubai) and Khorfakkan (Sharjah) — powered by the latest German robotics technology. Raw material to dispatch: zero human touch.

Visit Block Factory
1.2M+
Blocks / Month
Combined output, both factories
70,000+
Daily Output
Blocks per day
500,000+
Block Storage
On-site capacity